Jilin Petrochemical catalyst mechanical loading efficiency
For the first time, the Jilin Petrochemical Ethylene Glycol Plant has implemented an advanced domestic technology developed by the Equipment Maintenance Co., Ltd., based on the Beijing principle. This innovation allows the plant to independently handle the mechanical packing of catalysts, which were previously imported in large barrels. The new method significantly reduces labor input and boosts overall work efficiency.
The ethylene glycol plant uses catalysts that are stored in large drums. Before they can be loaded into the reactor, each individual tube must receive an equal amount of catalyst, which means dividing over 50 tons of catalyst into more than 9,570 small bags. This kind of large-scale distribution was once done manually, which was not only time-consuming but also inefficient.
To address this challenge, the plant has introduced a specialized sub-equipment designed for efficient and accurate dispensing. This equipment ensures even distribution, maintains proper quantities, and minimizes the need for manual weighing. As a result, tasks that used to take a full week to complete can now be finished in just two and a half days, greatly improving operational efficiency and reducing human effort. This technological upgrade marks a significant step forward in the plant’s modernization and process optimization.
Lamella Tube Settler,Pp Pipe Settler Medium,Clarifier Tube Settler,Treatment Tube Settler
Wuxi Qijing Machinery Technology Co., Ltd. , https://www.sinombbrmedia.com